[Vol 9.] Space Only Details Notification
Date : 2025.10.14
View : 9
Attachments :
Dear Exhibitors,
Greetings from Seoul
Cafe Show. 🍁
 
In appreciation of
your commitment in preparing for upcoming exhibition,
 
 
 
Please review the
detailed information according to the booth type applied.
This
notice is for Space Only exhibitors.
 
📕Floor
Plan (signage name not applied)
📕Trench Drawing (for water supply & drainage reference)
 
 
[Space
Only Provision]
📌 Floor
Surface (Raw Space Only)
 
[Space
Only Mandatory Checklist]
1. Booth Construction
Company Selection
📌 Booth constructions can only work
through COEX designated partner companies.
 
 
 
📕View COEX Official Contractor List
|
2. Space Only Booth Layout and Construction Application 2-1) Space Only Exhibitor :  📌 Exhibitor Portal -
Mandatory Application - Space Only Booth Construction & Design 📌 Mandatory
submission by October 15th (※Failure to submit may cause
disadvantages) 📌 Mandatory
Application       - Space Only Booth Layout (Floor
Plan, Elevation, Bird''s Eye View)         - Construction Company &
Constructor List 📌 Optional
Application (Suggested)       - Sustainability related data   2-2) Designated Booth Construction Company : Report to
COEX separately 📌 Please refer to
CAD Drawing and Trench Drawing for detailed booth construction plan. |
📕Trench Drawing (for water supply & drainage reference)
 
 
[Caution]
|
3-1) Installation of Booth Structures 📌 Construction
of all Space Only booths is only allowed through 📌 All exhibition
materials and booth structures must comply with the fire regulations,      building safety standards, and COEX
exhibition regulations.   3-2) Booth Structure Height Limitation 📌 The height
limitation varies based on the booth location, each at 4m, 4.5m, or 5m. 📌 Please refer to
the floor plan to confirm the maximum height |
|
3-3) Closed Booth Structure Not Allowed 📌 Space Only booths
with 6 booths or more cannot be constructed in a 📌 It is recommended
to construct at least 1/3 of the wall (device) in an open configuration, |
|
3-4) Electricity Installation 📌 Electricity for
space-only booths must be installed by official contractors designated by
COEX. 📌 Upon electricity
request to the organizer, only MCB is installed and connecting the cables shall
be done by each exhibitor in coordination of the official contractors.   3-5) Damage on COEX Facility is Prohibited 📌 Exhibitors
cannot drive nails or staples into COEX facilities (ceiling, walls, and
columns) [Concurrent Event - World Coffee Leaders Forum (WCLF)]   A leading knowledge platform for the Asian coffee and F&B industries, Maximize your promotion via collaboration with the 14th World Coffee Leaders Forum!   📕 WCLF Collaboration Proposal   Cafe Show Seoul will always put our best efforts to bring the best experience and meaningful outcomes for you.     Thank you. Cafe Show Seoul |